注意:因业务调整,暂不接受个人委托测试望见谅。
Water Well Rehabilitation:A Practical Guide to Understanding Well Problems & Solutions
Multiphase Flow in Oil and Gas Well Drilling
Analyzing Multidimensional Well-Being:A Quantitative Approach
Wave Propagation in Drilling;Well Logging and Reservoir Applications
Audel Water Well Pumps and Systems Mini-Ref
Electromagnetic Well Logging:Models for MWD/LWD Interpretation and Tool Design
Reservoir Engineering in Modern Oilfields:Vertical;Deviated;Horizontal and Multilateral Well Systems
Working Well.?:How to Correct the Unhealthy Workplace The Ergonomic Approach
Impact of WELL Building Standard v2 on the Office Building Energy Performance
Well Cementing Operations;1st Edition
Basics of Well-Mixed Room Air Distribution
COMPARISON BETWEEN OLED AND LED LIGHTING:USER PREFERENCES AND INFLUENCE ON WELL-BEING;IN FRANCE AND JAPAN
IEQ Applications:Designing Beyond the Well-Mixed Space
GB/T 37140-2018
IADC Deepwater Well Control Guidelines;2nd Edition
GB/T 38898-2020
4794-A Survey of Standing Column Well Installations in North America
4666 u2013 A Study of Geothermal Heat Pump and Standing Column Well Performance
GB/T 32073-2015
QC-06-059-Performance Analysis of Standing Column Well Ground Heat Exchanger Systems
1.具体的试验周期以工程师告知的为准。
2.文章中的图片或者标准以及具体的试验方案仅供参考,因为每个样品和项目都有所不同,所以最终以工程师告知的为准。
3.关于(样品量)的需求,最好是先咨询我们的工程师确定,避免不必要的样品损失。
4.加急试验周期一般是五个工作日左右,部分样品有所差异
5.如果对于(well检测检测标准)还有什么疑问,可以咨询我们的工程师为您一一解答。